Stairs, showing the two light fixtures.
Built in cabinet at the top of the stairs. There is an outlet and a network drop (for the computers and cable tv)
Cabinets in the laundry area above the washer and dryer.
Vanity in the master bathroom. The faucets are brushed nickel.
Garden tub in the master bathroom.
One of the things that needs to be completed is a bridge that connects the current part of the plan we are in to the newer construction. According to Derrek the bridge is ready for black top and should be done by May 1. He thinks our house will be done by May 9 or 10. He tentatively gave an anticipated walk through date of May 17. I like Derrek's dates!