The rest of the dry wall went up. A paper on the window shows that the framing was inspected and ready for drywall.
We went and selected the flooring. Ceramic tile for the downstairs and the upstairs bathrooms. Carpet on the stairs, the bedrooms and upstairs hallway. Vinyl flooring in the laundry area--I figured that all that is seen is about 4 inches around the washer and dryer so what does it matter. LOL. The carpeting we picked is called spicecake.
No comments:
Post a Comment